An unbelievably fast week... too occupied to even notice what day I was in. :D
A lot had been done this week - on Miller Road, Clifton Flats, Wesley road, Princes Road, and Constantia - but I'll make this post brief.
For Miller Road, the bathroom layouts had changed. Therefore, a new drawing had to be made. A 1:25 plan and four elevations (@ 1:50) for each of the 2 bathrooms were drawn. These needed to be done as quick as possible so they could go out for pricing.
For the Clifton Flats, the layouts of the 2 existing bathrooms had changed; therefore, changes had to be done for all the elevations as well All were drawn complete, in detail, to a scale of 1:25 with dimensions.
For the Wesley Road project, Yusuf had completed the council submission drawings. All that needed to be done was to print and colour. I had pitched in with the printing and colouring of the plans. :D
For Princes Road, a revised council submission needed to be drawn up. Changes to the basement plan had been made. I had to do some minor tweaking on that.
For the Constantia project, changes had been made to the basement plan and therefor changes to all the sections and elevations and roof plan needed to be made. This is quite an intricate project to work on, so we're still in process with it.
Tomorrow will be our Q&A session at CPUT. See you guys there!...