Friday, May 13, 2011

Post # 13

In the office...
Funny coincidence: The 13th post on “Friday the 13th” hahaha! Well not too big on superstitions, but anyway back to work… :)

The week started off a bit slow. Minor changes to the Miller Road Tender documents again. As the week progressed it was a bit busy. I had to work on some details for the Miller Road Tender documents – the details for the staircase handrails – learning how the smallest detail (down to the fixings) is very critical for this type of drawing. The builder needs to know exactly how they need to build it to the last millimetre. This is beyond the mere conceptual drawings. I also worked on the braai area/ patio details which – the same – had to be correct to the last millimetre. Noel still has to check them for me. From that point, he can go out to tender.

A bit of work was also done on the Clifton Flats. New bathroom layouts had to be done – the one bathroom has to be extended (a 1.7 x 2.4m bathroom) which also has to include a new vanity unit to be installed. We still need to finalise a tiling layout for these bathrooms and the electrical layout has to be done.

The hub process is going well I think. I need the lecturers to help me finalise my design. But, if you would like to comment on my design please feel free to do so… I need all the help I can get…

Thanks,
Rukiya

No comments:

Post a Comment